News Flash Home
The original item was published from 8/26/2016 12:19:22 PM to 9/3/2016 12:00:01 AM.

News Flash

Butte-Silver Bow

Posted on: August 26, 2016

[ARCHIVED] Public Works Update for the Week of August 29, 2016

Roads:
• Cobban to Front, from Harrison to Montana – sweeping;
• George south, from Continental to Harrison - sweeping;
• The area around the Butte Country Club – sweeping;
• Top of Main, La Platte to Granite, Clark to the East – sweeping;
• Lower West Side, Park Street to the South and Excelsior to the West – Flushing;
• Main and Granite – Continue Street Painting;
• Butte High School area – repainting/repairing crosswalks; and
• Continued pot hole filling and crack sealing
Water Utilities:
• Meadow Brook Drive – pipe replacement work – road will be open with traffic control measures;
• Area around 2604 Evans Street (near intersection of Evans and Thomas), traffic will be open, equipment be in and out of area – pipe repairs; and
• Intersection and general area of Wynne and Water Line Road – New South-side Pump Station work – Section of road closed to traffic
Metro Sewer:
• Aluminum Street from Washington to Main Street – Sewer replacement, road closed; and
• Granite and Main Street Extension:
- The Intersection of Granite and Ophir;
-The Intersection of Park Street and Mining Museum Road;
-Montana Tech Road and Mining Museum Road; and
-The North Entrance to Montana Tech’s Natural Resources Building

Facebook Twitter Email